Works comprised of placing of topsoil and planting of Mature Boxed Lime Trees (Tilia) in a continuous curved planter with underground guying and irrigation system. The planter was then topped off with a layer of white pebbles. Three other trees were planted in Stainless Steel circular planters and a small area of turf was also laid.
To one side of the main site, an existing embankment was top-soiled and planted with a variety of shrubs and hedging.
The works were completed on time and to budget creating an immediate impact in an existing industrial environment.