Lingfield Point, Darlington


Planting of Mature Boxed Limes and turf laying. for ROK Construction
Date : October 2005 - Ongoing
Sones Lingfield Point
Sones Lingfield Point 2
Sones Lingfield Point 3

Works comprised of placing of topsoil and planting of Mature Boxed Lime Trees (Tilia) in a continuous curved planter with underground guying and irrigation system.  The planter was then topped off with a layer of white pebbles.  Three other trees were planted in Stainless Steel circular planters and a small area of turf was also laid.

To one side of the main site, an existing embankment was top-soiled and planted with a variety of shrubs and hedging.

The works were completed on time and to budget creating an immediate impact in an existing industrial environment.